On Saturday the woodwork for the main roof was completed, ready for the Staffordshire Blue tiles to go on this week. As the photo and the video of the main hall shows, the internal scaffolding has now been removed and the large pile of insulation has been placed, both on the ceiling and on the floor, prior to the pipework for the heated floor being installed this week. Once the pipes are in place a concrete screed will be laid over them.

……
The following photos show the meeting room and the kitchen. In the first photo taken from what will be the new patio, you can see the angled glass doors leading to the meeting room, with the doorway to the kitchen and then the heating control room on the left.

A close up of the angled opening into the meeting room. These are full length glass doors that open out onto the patio.
From the meeting room, this is the hatch way with a roller shutter to the kitchen, with the patio doors on the left.

Looking into the kitchen, the roller shutters will be on the left with a large roof light above.
Thanks to JF-S for the photos and Martin for the video.