This week the windcatcher was installed onto the roof. Its role is to circulate fresh air and ventilate the hall when necessary.

Internally the main floors have had their final preparation ready for the laying of the wood floor. This photo shows Bertie giving his opinion of the new hall, standing next to the floor planking.

The oak facings at the front of the hall and alongside the public footpath are in place. The stopes (stone bollards) on the footpath have been relocated to conform to disabled access regulations and this path will be open, as planned, on Monday.



As always click on any of the photos to enlarge them and thanks to Ben for these pictures.


Leave a comment