Over the last week things have been happening so quickly it is difficult to know which photos to show. Inside the oak floor has been laid and will be sanded and oiled, currently it is under hardboard to protect it, as work continues in the main hall. Please click on any photo to enlarge it.

The oak and painted doors are all hung. The photo below shows the double sliding doors, located under the messine storage, that open into the foyer. The workman on his hands and knees is laying the natural limestone floor that runs from the entrance to the kitchen. Oak skirtings will be fitted through the hall.

The kitchen has now been fully fitted, and what a kitchen!
It is a state of the art, commercial kitchen with stainless steel work surfaces, large larder fridge & freezer, warming cupboards, dishwasher and has an instant hot water boiler.

The toilets are now also finished.

Outside most of the drystone wall beds have been built and at the rear the various levels for steps, slope and patio area are now clearly visible. At the front Gordon (on the right) and Lee are now laying the granite setts and steps that lead from the front entrance towards the public footpath and The Square.




Leave a comment