According to details on the PDNPA website, planning permission has been granted for two wind turbines at Hill Top Farm, each at a tower height of 24.5m, with a further 9m rotor radius. This is smaller than the originally rejected proposal, which measured 48.4m from base to blade tip. Note also that this is a time-limited consent, which expires after 25 years.
Click here to read the letter of notification, and click here for links to all the publicly available documentation.


Leave a comment